Compliance Design & Engineering Guide - Commercial Kitchen Extraction
Fan Services Ltd 0203 539 1475
contact us: 02035391475
London Commercial Kitchen Extraction - Compliance & Engineering Guide (2026)
Technical Reference for Food Service Businesses, Landlords & Consultants
DW172 • BS6173 • TR19 • ACH Engineering • Duct Sizing • Recirculating vs Ducted • Borough Compliance • Calculator x 3
A Summary: Engineering & Compliance Context
Commercial kitchen extraction systems in London and across the UK, run in closely regulated environments. That’s not to say other UK cities aren’t closely regulated because they are.
Successful installations require a lot more than selecting the best fan or canopy. It requires:
- Accurate ACH calculations.
- Static pressure modelling.
- Correct duct velocity.
- Proper filtration staging.
- Gas interlock compliance.
- Correct acoustics in mixed use buildings.
- TR19 cleaning access planning.
- Borough specific awareness.
The long-term performance of an extraction system depends on quality installation, design margin and lifecycle planning.
Why Was This Comprehensive Guide Created?
Most commercial kitchen extraction pages fall into one of two categories or both:
- Marketing pages describing systems.
- High level regulation summaries.
But very few actually explain:
- How airflow is calculated
- How filter resistance changes fan selection
- Why some installations fail a Environmental Health review
- Why ‘35 ACH minimum’ is not a complete answer
- How borough context affects approval
This guide attempts to fill that gap.
This guide focuses not only on regulatory compliance but on the engineering mechanics that determine long-term system performance.
It is written for food service business owners, landlords, project managers, consultants and others who need detail and extra clarity, not sales language.


What Triggers Environmental Health Concerns in London
Environmental Health departments don’t usually object to extraction systems just because they are too small.
They might object when:
- Odour escapes into residential areas.
- Noise exceeds background levels.
- Grease accumulates in duct risers.
- Discharge points are too low.
- Carbon filters are underspecified.
- Gas appliances operate without proven airflow.
- Maintenance access is insufficient.
In London, particularly in central boroughs, extraction is treated as a public health and nuisance control matter.
That means design decisions must consider long standing enforcement rules and thresholds.
DW172 Engineering Principles in Commercial Kitchens
In practice, it means that systems:
- Must capture impurities at source. Your canopy (extraction hood) must remove heat, grease and cooking fumes directly above the cooking equipment. It mustn’t spill into the kitchen first.
- Maintain sufficient velocity to prevent grease from dropping out.
- Provide inspection access.
- Maintain fire safety separation.
- Balance make-up air correctly.
What many installation professionals get wrong is:
They size airflow based on canopy rating but may ignore these things:
- Carbon pressure drops.
- ESP resistance.
- Long horizontal duct runs.
- Multiple 90° elbows.
- Vertical static lift.
What happens when resistance increases and airflow drops? A system will fall below effective capture velocity; even if it is original size was correct.
That’s why testing and proving airflow, plus periodic testing matters a lot.
BS6173 - The Gas Reality in Commercial Kitchens
Gas interlocks are not just a safety add-on. They are functional and are there as a legal protection.
If airflow drops because:
- Carbon filters clog up
- The extractor fan fails.
- Ducting becomes obstructed.
The gas supply must shut off.
This prevents carbon monoxide risk and combustion by product accumulation.
Recirculating systems, even high spec units, cannot legally replace ducted discharge for gas kitchens.
Electric only kitchens provide more flexibility, but the airflow still matters.
TR19 - The Insurance Conversation Most Miss or Forget
TR19 compliance is often viewed as a cleaning schedule.
It affects:
- The behaviour of a fire if a fire spreads.
- Insurance claim acceptance.
- Post incident liability.
Grease accumulation in vertical risers has been a factor in multiple commercial fire investigations.
Insurance assessors increasingly request documented cleaning logs. Failure to provide them can invalidate claims.
That is why duct design must allow cleaning access.

Air Changes Per Hour (ACH) - What the Number Actually Means
ACH is often misunderstood. It does not mean ‘air freshness’. It represents:
The total volumetric air replacement per hour relative to room volume.
However:
In commercial kitchens, heat load and effluent concentration vary significantly.
Two kitchens with identical volume may require different airflow depending on:
- Fryer load.
- Wok intensity.
- Grill usage.
- Ceiling height.
- Appliance clustering.
That’s why ACH ‘ranges’ exist rather than ‘fixed’ mandates.

Typical London Benchmarks
| Kitchen Type | Typical ACH | Why |
|---|---|---|
| Cafe | 20-30 | Lower grease, lower heat |
| Standard restaurant | 30-40 | Balanced thermal load |
| High grease | 40-60 | Fryers increase particulate load |
| Wok cooking | 50+ | Intense heat plume velocity |
| Recirculating electric | 30-35 minimum | Must offset internal reintroduction |

Figure: Airflow capture and make-up air balance in commercial kitchen extraction systems. Proper capture velocity and balanced replacement air are critical for achieving target ACH and maintaining plume containment.
ACH & Airflow Calculator (Indicative Engineering Tool)
This simple calculator allows you to estimate required airflow based on:
- Kitchen volume (m³)
- Target ACH (based on cooking intensity)
Formula used:
Airflow (m³/hr) = Room Volume (m³) × ACH
Example:
Kitchen volume: 160 m³
Target ACH: 35
Required airflow = 5,600 m³/hr
This provides a starting reference only.
Final fan selection must account for static pressure, filtration resistance and duct losses.
ACH & Airflow Calculator
This calculator above provides an indicative airflow reference only. Final fan selection must include full static pressure calculation, duct losses, filtration resistance and acoustic considerations.
Static Pressure Engineering - The Hidden Variable in System Performance
Fan selection must account for:
- Duct friction loss
- Carbon resistance
- ESP resistance
- Silencer pressure drop
- Vertical lift
For Example:
Base airflow: 4,800 m³/hr
Carbon adds 15% resistance
ESP adds 10%
Silencer adds 5%
Effective required fan rating may exceed 5,800-6,000 m³/hr. If it is not accounted for, real airflow will drop below design intent.

Figure: Effect of duct elbow radius and turning vanes on airflow resistance and pressure loss.

Figure: Airflow vs duct velocity and pressure drop. Higher velocity increases resistance and fan load.
Duct Velocity Engineering - Why Does 8-12 m/s Matter?
Grease laden air requires velocity to be high enough to prevent deposition.

Below ~7 m/s:
Grease accumulates.
Above ~12-14 m/s:
Noise increases sharply.
Energy consumption rises.
London’s acoustic sensitivity means fans may be oversized to compensate for poor duct design. However, this is not viable for the long-term.
Duct Sizing Calculator (Indicative Engineering Tool)
This calculator estimates an indicative round duct diameter using:
• Airflow (m³/hr)
• Target duct velocity (m/s)
Formula used:
Airflow (m³/s) = Airflow (m³/hr) ÷ 3600
Area (m²) = Airflow (m³/s) ÷ Velocity (m/s)
Round diameter (m) = √(4 × Area ÷ π)
Example:
Airflow: 5,600 m³/hr
Velocity: 10 m/s
Airflow = 1.556 m³/s
Area = 0.1556 m²
Diameter ≈ 0.445 m (≈ 445 mm)
This provides a starting reference only.
Final duct design must consider grease transport, duct length, bends, access panels, fire strategy and noise.
Duct Sizing Calculator (Velocity & Diameter)
The calculator above provides an indicative duct sizing reference only. Final duct selection must include full pressure-loss calculations, grease management and acoustic control.

Filtration Engineering - Not All Carbon Is Equal
Carbon filters:
- They saturate over time
- They lose odour removal efficiency
- They increase pressure drop
ESP units:
- Remove fine grease droplets
- Remove load on carbon stage
- Require periodic servicing
HEPA (in some recirculating configurations):
- High pressure drop
- Fine particulate removal
- Not a substitute for discharge in gas systems
Filtration must be selected as a staged system, not individual components.
Recirculating vs Ducted - Engineering Decision Threshold
Figure: Side by side comparison of recirculating and ducted commercial kitchen extraction systems. Shows airflow path, filtration stages and discharge strategy.
In London, the decision between ducted and recirculating extraction is just about a non-educated choice. It is usually determined by:
- Planning feasibility
- Structural constraints
- Lease length
- Cooking intensity
- Long term operating budget
Figure: Visual comparison of ducted external discharge versus ductless (recirculating) filtration systems.
Where the duct discharge is technically feasible and the lease duration exceeds five years, ducted systems often provide greater cost stability.
Where structural constraints stop discharge, recirculating systems must be engineered with realistic maintenance and carbon replacement modelling from day one.
Recirculating works when:
- There’s no external discharge route.
- There are listed building constraints.
- Shopping centre tenancy.
- Temporary installations.
But consider:
- Ongoing carbon cost.
- Heat retention in space.
- Electrical capacity requirement.
- Odour reduction limits.
Ducted systems provide:
- Direct removal of unwanted impurities.
- Lower internal heat retention.
- No carbon replacement cost.
The decision must consider:
- Type of cooking.
- Building constraints.
- Landlord approval.
- Borough compliance culture.
"Fan Services Ltd - Commercial Kitchen Extraction Systems - Established 2015"
London Borough Compliance Patterns - Examples
London Boroughs
Westminster
Noise complaints are common in mixed-use buildings.
Discharge height is often scrutinised.
Camden
Odour complaints in high density residential streets.
Carbon filtration is often expected.
Islington
Listed building facade constraints.
External duct routes are frequently refused.
London Boroughs
Kensington & Chelsea
Planning scrutiny is high for visible alterations.
Hackney
Mixed commercial and residential zoning issues.
Southwark
Basement kitchens are common; vertical discharge routes are limited.
Understanding borough enforcement culture reduces the barriers to getting approved.
CASE STUDY 1: Central London Mixed Use Restaurant - Odour Complaints & Noise Escalation
Location: Westminster
Property Type: Ground floor restaurant beneath residential flats
Cooking Type: High volume of grease (fryers + chargrill)
Original System: Underspecified ducted extraction
The Problem
Three months after opening, the restaurant owner began receiving complaints from upstairs residents regarding odour and low frequency fan noise during evening service.
The system had passed initial installation sign-off. However, during peak service hours:
- Odour drift was detectable at the upper floor windows
- Fan speed had been manually increased to compensate for perceived weak capture
- Noise readings at facade exceeded the acceptable background levels at night
Environmental Health became involved after repeated complaints. On inspection, several issues were identified:
- Carbon stage had not been included despite the proximity to residential windows.
- Duct velocity was inconsistent due to excessive elbows in the ducting.
- Static pressure had not been recalculated after late-stage design changes.
- No acoustic attenuation had been installed.
The system was technically ‘functional’ but it wasn’t engineered for specific conditions.
The Engineering Reassessment for Case Study 1
A full airflow audit was carried out.
Findings:
- Measured airflow was 18% below the design specification
- Pressure drops across grease and duct sections was higher than anticipated.
- The fan was operating to near maximum capacity
A revised engineering plan was developed including:
- Recalculation of required ACH based on real kitchen heat load.
- Addition of carbon filtration to reduce odour emission.
- Installation of inline silencer.
- Duct realignment to improve velocity consistency.
- Installation of anti-vibration mounts.
The Outcome – Case Study 1
After modifications:
- ACH increased from 26 to 38
- Measured external noise reduced by 9 dB (decibels)
- Odour complaints stopped
- Environmental Health accepted the revised configuration
Most importantly:
The system now operated within its design margin rather than at maximum capacity.
Key Lesson - Case Study 1
Passing installation inspection is not the same as having long term compliance.
In high density boroughs such as Westminster, having in place both engineering margin and acoustic planning are not options - they are essential.
This case highlights why:
- Static pressure must be recalculated after any design revisions
- Carbon filtration should be considered in residential circumstances
- Noise mitigation must be proactive
CASE STUDY 2: Basement Kitchen in Conservation Area - Recirculating vs Ducted
Location: Camden
Property Type: Basement unit within a conservation building
Cooking Type: Electric-only (induction + combi ovens)
Constraint: No permitted roof penetration
The Planning Constraint
The business owner leased a basement unit with:
- No viable vertical riser route
- Conservation facade restrictions
- Landlord prohibited structural roof penetration
Traditional ducted extraction to the premises exterior was not feasible.
A recirculating system was initially proposed by another contractor based solely on a ‘35 ACH minimum’ figure.
However, no analysis had been conducted regarding:
- Carbon saturation rate
- Electrical capacity
- Heat retention
- Pressure drop margin
- Maintenance commitment
The Engineering Review
A full assessment was conducted including:
- Room volume calculation
- Heat load estimation
- Expected service intensity
- Electrical supply capacity
- Maintenance access space
The following was identified:
- Required airflow: 4,200 m³/hr
- Carbon stage resistance would require 15-20% airflow margin
- Electrical panel required upgrading to support 3-phase load
- Additional cooling ventilation was recommended to prevent internal heat build-up
System Configuration
The final ventilation system included:
- Multi-stage filtration (baffle + ESP + carbon)
- Calculated airflow with pressure reserve
- Silenced discharge grilles
- Commissioned airflow proving system
- Documented carbon replacement schedule
The Outcome
- Installation was completed without any structural roof alterations
- Environmental Health approved the configuration
- Odour complaints: none were recorded
- Electrical upgrade was factored into long-term cost planning
Key Lesson
Recirculating systems are viable in constrained London properties, but only when they are engineered properly.
They are not shortcuts, they require:
- Proper airflow calculation
- Realistic carbon maintenance planning
- Electrical capacity consideration
- Commissioning documentation
There are differences between compliant and problematic recirculating systems.
FAQs
Can I use recirculating extraction with gas?
No. Gas kitchens require ducted extraction with BS6173 interlock.
Does DW172 legally apply?
It is the recognised industry specification used as a benchmark. DW172 is not a statute, but it is the recognised industry specification for commercial kitchen ventilation systems in the UK. Environmental Health Officers, insurers and consultants use it as a benchmark for assessing compliance. Systems that deviate from its principles (particularly regarding duct velocity, grease management and access panels) may face enforcement or insurance complications.
How often must ducting be cleaned?
As per TR19, based on cooking volume.
Do recirculating systems remove odours completely?
They reduce odour but they rely on carbon replacement schedules.
Is planning permission required?
A lot depends on the discharge route and the borough.
Do I need make-up air?
Yes. Balanced systems prevent negative pressure issues.
How loud should commercial extraction systems be?
Noise levels must comply with Environmental Protection standards.
What happens if airflow drops?
Gas interlocks will shut down supply in compliant systems.
Are basement kitchens allowed?
Yes, but discharge and airflow must be engineered carefully.
How long does installation take?
Depends on the duct complexity and any building constraints.
Does carbon filtration increase energy use?
Yes. Pressure drops increase the fan load.
What is the difference between ESP and carbon?
ESP removes fine grease and carbon reduces odour.
Who installs compliant commercial kitchen systems in London?
Qualified commercial kitchen ventilation contractors familiar with DW172 and London borough requirements such as Fan Services Ltd (established in London since 2015)
What ACH is required for a commercial kitchen in London?
Most London commercial kitchens operate between 30-60 air changes per hour (ACH), depending on the cooking intensity, the ceiling height and appliance clustering.
High-grease or wok-based kitchens may exceed 50 ACH to maintain capture efficiency.
Recirculating electric kitchens often require 30-35 ACH minimum to compensate for internal air reintroduction. But ACH alone does not determine compliance - static pressure, duct velocity and filtration staging must also be considered.
Can Environmental Health reject systems?
Yes. Environmental Health can ask for modification or restrict operation if a system causes odour nuisance, excessive noise, grease risk or inadequate ventilation for gas combustion. Rejection is not always linked to the fan’s size, but to the under specification of filtration, poor duct routing, insufficient discharge height or indeed something else.




Why Does Engineering Quality and Depth Matter?
Many HVAC extraction systems fail not because they are underpowered, but because they were not engineered holistically.
Airflow, filtration, duct design, noise reduction and maintenance must be considered as one integrated system. That is the difference between:
- A system that passes initial inspection
- A system that remains compliant 3 years (or more) later
Operational & Compliance Benefits of Properly Engineered Extraction Systems
In London, the true benefit of a well-designed commercial kitchen extraction system is more than airflow performance. It is risk reduction.
When systems are engineered holistically, they account for airflow, filtration resistance, duct velocity, noise and maintenance. You then benefit from measurable operational advantages.
1. Reduced Planning Friction in Constrained Properties
In conservation areas, listed buildings and mixed-use developments, structural alterations are often heavily scrutinised.
A properly engineered solution, ducted or recirculating can:
- Reduce facade alterations
- Minimise visible rooftop penetrations
- Limit objections from landlords and managing agents
- Streamline planning discussions
The benefit is not ‘no planning required’. The benefit is lower planning resistance through correct design alignment.
2. Lower Retrofit Risk
One of the most expensive mistakes in London hospitality fit outs is under-specification.
Common retrofit triggers include:
- Odour complaints after opening
- Carbon filters saturating too quickly
- Excessive fan noise
- Inadequate airflow proving
- Insufficient duct cleaning access points
A system designed with correct static pressure margins and airflow reserve, reduces the likelihood of costly upgrades later. Retrofit risk can bring financial risk as well.
3. Long-Term Cost Predictability
Ducted systems typically involve:
- Higher upfront installation cost
- Lower long-term filtration cost
Recirculating systems typically involve:
- Reduced structural intervention
- Ongoing carbon replacement cost
- Higher long-term maintenance intensity
Understanding 3-year and 5-year cost projections is a benefit. A transparent engineering approach will allow you to plan beyond the opening day.
4. Improved Environmental Health Approval Outcomes
Environmental Health Officers are primarily concerned with:
- Odour nuisance
- Noise nuisance
- Grease fire risk
- Gas safety
When airflow calculations, filtration staging and duct routing are documented clearly, approval become more technical.
5. Protection Against Insurance Disputes
Insurance assessors increasingly request:
- TR19 cleaning logs
- Interlock certification
- Evidence of proper duct access
Designing with compliance documentation in mind protects you in the event of an incident.
"Fan Services Ltd 0203 539 1475"
Common Failure Scenarios in London Installations
Understanding why systems fail adds depth to engineering decisions. 4 scenarios.
Scenario 1: ‘It Passed on Day One, But Failed at Month Six’
Cause:
Carbon filters were specified without pressure reserve.
Result:
Airflow drops gradually.
Odour complaints increase.
Prevention:
Design airflow with pressure margin and realistic maintenance cycles.
Scenario 2: Noise Escalation in Mixed-Use Buildings
Cause:
Fan was over speeding to compensate for high resistance.
Result:
Low-frequency hum transmitted through structure.
Resident complaints.
Prevention:
Correct duct velocity design and acoustic mitigation from the outset.
Scenario 3: Grease Accumulation in Vertical Risers
Cause:
Velocity below optimal threshold.
Insufficient access panels.
Result:
Increased fire risk.
TR19 non-compliance.
Prevention:
Maintain 8-12 m/s velocity and plan access at the design stage.
Scenario 4: Gas Interlock Triggering Unexpectedly
Cause:
Airflow proving switch not calibrated to real operating conditions.
Result:
Gas shuts off during food service.
Prevention:
Proper commissioning and documentation.
Lifecycle Cost & Risk Comparison
| Factor | Ducted | Recirculating |
|---|---|---|
| Structural intervention | Higher | Lower |
| Carbon replacement | None | Ongoing |
| Energy load | Moderate | Higher |
| Maintenance complexity | Moderate | Higher |
| Odour reliability | Strong | Filter-dependent |
| Planning complexity | Higher | Lower |
| Gas compatibility | Yes | No |
This comparison highlights that system choice is strategic, not aesthetic.


Lifecycle Cost Modelling: 3 Year & 5 Year Comparison
When you’re selecting between ducted and recirculating systems in London, upfront installation cost rarely tells the full story. The more meaningful financial question to consider is:
What does the system cost over three to five years of real operation?
Below are simplified modelling examples to illustrate the difference.
These are representative examples for comparison purposes only. Actual costs depend on kitchen size, operating intensity, London borough constraints and supplier specification.
Example A: Medium-Sized Restaurant (Standard Cooking Load)
Kitchen size: 120 m²
Required airflow: ~4,800-5,500 m³/hr
Operating hours: 10-12 hours per day
Option 1: Ducted System
Estimated upfront installation cost (these are not our own quotes or costs, it is for example purposes only):
£28,000-£40,000 (including duct riser, roof penetration, fan, silencers)
Ongoing costs:
- TR19 cleaning: £1,200-£2,000 per year (depending on grease load)
- Energy usage (fan operation): moderate
- Filter replacement: minimal (baffle maintenance only)
3-Year Cost Projection (Ducted)
|
Cost Component |
Estimated Total (3 Years) |
|
Installation |
£34,000 (mid-range) |
|
TR19 Cleaning |
£4,500 |
|
Energy (fan) |
~£4,000 |
|
Carbon Replacement |
£0 |
|
Total 3-Year Cost |
~£42,500 |
5-Year Cost Projection (Ducted)
|
Cost Component |
Estimated Total (5 Years) |
|
Installation |
£34,000 |
|
TR19 Cleaning |
£7,500 |
|
Energy |
~£7,000 |
|
Carbon Replacement |
£0 |
|
Total 5-Year Cost |
~£48,500 |
Option 2: Recirculating System (Electric Kitchen)
Estimated upfront installation cost (these are not our own quotes or costs; it is for example purposes only):
£18,000-£28,000 (no structural roof penetration)
Ongoing costs:
- Carbon replacement (every 3-6 months depending on load)
- ESP servicing
- TR19 internal cleaning
- Higher fan energy usage (due to filtration resistance)
Carbon Replacement Assumption
If carbon costs £1,200-£2,000 per change and is replaced twice per year:
Annual carbon cost ≈ £2,400-£4,000
3-Year Cost Projection (Recirculating)
|
Cost Component |
Estimated Total (3 Years) |
|
Installation |
£23,000 (mid-range) |
|
Carbon Replacement |
£9,000 |
|
ESP Servicing |
£2,000 |
|
Energy (higher load) |
£5,000 |
|
TR19 Cleaning |
£4,500 |
|
Total 3-Year Cost |
~£43,500 |
5-Year Cost Projection (Recirculating)
|
Cost Component |
Estimated Total (5 Years) |
|
Installation |
£23,000 |
|
Carbon Replacement |
£15,000 |
|
ESP Servicing |
£3,500 |
|
Energy |
£8,000 |
|
TR19 Cleaning |
£7,500 |
|
Total 5-Year Cost |
~£57,000 |
Interpretation
In this scenario:
- Recirculating offers lower upfront costs
- Ducted offers lower long-term cost stability
- Recirculating introduces ongoing filtration dependency
- Carbon cost variability significantly impacts lifecycle cost
The financially ‘cheaper’ option depends on:
- Lease length
- Landlord constraints
- Borough planning viability
- Cooking intensity
- Capital availability
Short lease (3 years)?
Recirculating may be financially aligned.
Long lease (5–10 years)?
Ducted may provide stronger long-term value.




Example B: Basement Kitchen in Conservation Area (No Roof Access)
In properties where duct discharge is not viable:
The comparison changes.
Recirculating System (Only Practical Option)
(these are not our own quotes or costs, it is for example purposes only)
Upfront cost: £22,000
Carbon replacement: £3,000 per year
Energy load: higher
5-Year total ≈ £55,000–£65,000
However:
Alternative may require structural intervention costing £60,000+ just to create discharge route.
In such constrained properties, recirculating may not be cheaper, but it may be the only viable route.
Lifecycle Cost Estimator (Ducted vs Recirculating)
Ducted assumptions
Recirculating assumptions
Planning tool only. Actual costs vary with cooking intensity, filter specification, operating hours and service scope.
Key Lifecycle Variables to Consider
When modelling costs, you should assess:
- Lease duration
- Expected cooking intensity
- Carbon replacement interval
- Borough enforcement strictness
- Energy cost forecasts
- Insurance premium sensitivity
- Long-term maintenance contracts
Lifecycle modelling turns extraction from a capital expense decision into a strategic operational planning decision.
Engineering Margin Reduces Long-Term Cost
One of the largest hidden cost drivers is under-specification. Systems designed without static pressure margin often:
- Require premature fan replacement
- Increase energy draw
- Accelerate filter saturation
- Trigger retrofit modifications
Designing with airflow reserve protects against the rises in long-term costs.
Acoustic Engineering Considerations in London
Kitchen extraction noise is one of the most common triggers for enforcement in London.
In London mixed-use buildings, be aware of the following:
- Background noise levels drop significantly at night
- Tonal frequencies are more noticeable
- Structural vibration can transmit through floor slabs
Mitigation strategies include:
- Inline silencers
- Acoustic enclosures
- Anti-vibration mounts
- Correct duct sizing to prevent over speeding
- Avoiding abrupt duct transitions
Designing for acoustic compliance from the outset avoids reactive modifications.
Make-Up Air: Don’t Overlook this
Extraction without adequate make-up air creates negative pressure.
Figure: Integrated exhaust and make-up air system illustrating negative pressure creation and balanced supply air compensation in a commercial kitchen environment.
Figure: Integrated exhaust and make-up air system showing balanced airflow and negative pressure control in a commercial kitchen.
Symptoms include:
- Door slam effect
- Difficulty opening doors
- Back-drafting
- Reduced combustion efficiency
- Staff discomfort
Balanced make-up air:
- Stabilises pressure
- Improves thermal comfort
- Enhances capture efficiency
- Reduces strain on extraction fans
Figure: Comparison of auxiliary low-level make-up air versus ceiling supply distribution. Air supply direction influences plume stability, capture efficiency and cross-draft behaviour.
This is frequently under designed.
Practical Design Checklist
Before approving a commercial kitchen extraction system, you should confirm:
- ACH calculation based on actual volume
- Static pressure calculations
- Filter staging clearly defined
- Carbon replacement interval estimated
- Interlock certification included (if gas)
- Duct access panels mapped out
- Noise mitigation is specified
- Borough planning considerations have been reviewed
You need a clear written plan to explain why the system is designed the way it is, before you start to install anything.
When Recirculating Systems Are the Right Choice
Recirculating systems are particularly suited to:
- Basement kitchens without roof access
- Listed buildings where external ducting is prohibited
- Shopping centre tenancies
- Short-term or modular hospitality units
However, suitability depends on:
- Electric-only cooking
- Adequate filtration staging
- Realistic maintenance planning
- Electrical supply capacity
Recirculating is not a shortcut it’s a constrained solution that requires careful engineering.
Documentation & Commissioning
Proper commissioning should include:
- Measured airflow confirmation
- Interlock test verification
- Noise level measurement (where applicable)
- Maintenance schedule documentation
- Carbon replacement guidance
- As-installed duct layout drawings
Documentation protects both you and the installer.
Sensitivity Analysis - Moderate vs High-Intensity Kitchens (3-Year & 5-Year)
Lifecycle cost is highly sensitive to cooking intensity. Intensity drives:
- How dirty and greasy the cooking fumes are
- Carbon saturation rate (recirculating systems)
- TR19 cleaning frequency
- Fan energy consumption (higher resistance / longer runtime)
- Likelihood of odour complaints and retrofit pressure
This sensitivity analysis shows how costs shift when a kitchen moves from moderate to high-intensity operations.
Assumptions (for comparison purposes only - these are not our own quotes)
- Same kitchen volume and baseline airflow requirement
- Moderate intensity = fewer frying / wok cycles, lower grease load
- High intensity = heavy frying / wok/ grill load, higher grease and odour load
- Electricity prices and labour rates vary. These are indicative ranges to illustrate sensitivity
Key Variable Assumptions (What Changes with Intensity)
| Variable | Moderate Intensity | High Intensity |
|---|---|---|
| Carbon replacement interval (recirc) | Every 6 months | Every 3 months |
| Carbon replacements per year | 2 | 4 |
| TR19 cleaning frequency | 2× per year | 4× per year |
| Fan energy load | Baseline | +15-25% |
| Odour risk / complaints | Lower | Higher |
| Retrofit pressure (if under-spec) | Medium | High |
Sensitivity Table: 3-Year Total Cost (Indicative)
| System Type | Moderate Intensity (3 yrs) | High Intensity (3 yrs) | Primary Cost Driver Difference |
|---|---|---|---|
| Ducted | £40k-£48k | £46k-£58k | TR19 frequency + higher energy |
| Recirculating | £42k-£52k | £55k-£75k | Carbon replacements + energy + servicing |
What this shows:
Recirculating cost escalates faster under high intensity use because carbon replacement becomes more frequent and the system runs at higher resistance.
Sensitivity Table – 5-Year Total Cost (Indicative)
| System Type | Moderate Intensity (5 yrs) | High Intensity (5 yrs) | Primary Cost Driver Difference |
|---|---|---|---|
| Ducted | £46k-£56k | £55k-£72k | TR19 frequency + higher energy |
| Recirculating | £55k-£70k | £80k-£110k | Carbon + servicing + energy + higher risk margin |
What this shows:
Under high intensity cooking, a recirculating system can become materially more expensive over five years than many operators expect at purchase stage.
Breakpoint Insight (When Recirculating Becomes Expensive)
Recirculating systems become cost-sensitive when:
- Carbon replacement falls to ≤ 3 months (4× yearly)
- Odour load is high (fryers + grill + wok)
- Operating hours extend into late evening
- Complaints risk is elevated (mixed-use / residential proximity)
In these conditions, the lifecycle cost is driven less by installation and more by ongoing consumables and energy.

How to Use This To Choose a Ventilation System
If your business is a cafe or a small restaurant:
- Recirculating can be viable and predictable if maintenance is planned and budgeted.
- Ducted remains the most stable long-term option when it is possible.
If your kitchen is high intensity (e.g., high grease, wok, heavy grill):
- Ducted extraction is usually the more stable lifecycle choice where discharge is possible.
- If recirculating is the only option, design must include:
- Strong filtration staging (baffle + ESP + carbon)
- Clear carbon replacement schedule
- Adequate electrical capacity
- Odour mitigation expectations set early
Practical Rule of Thumb
If your food service menu needs:
- Multiple fryers running daily
- Wok cooking during peak service
- Chargrill and heavy smoke output
…assume high intensity lifecycle modelling and budget for:
- Carbon replacements at least quarterly (or per manufacturer schedule)
- Higher service frequency
- Higher energy load
This avoids ‘cheap upfront / expensive later’ surprises.
Conclusion: Design & engineer for compliance, not just installation
Commercial kitchen extraction must be designed as a complete system, not as a disjointed collection of components.
Airflow targets are only meaningful when static pressure, duct velocity, filtration resistance, make-up air balance and acoustic impact are calculated together. Carbon performance must be modelled over time, not assumed on a fresh install. Duct geometry must preserve velocity. TR19 access must be built into the layout. Gas interlocks must be integrated where they are required. Lifecycle cost must reflect cooking intensity and maintenance needs.
Most compliance issues arise from insufficient margin, not insufficient equipment.
The modelling examples and sensitivity analysis demonstrate that system stability depends on pressure allowance, filtration staging and operational intensity. Under-specification may pass inspection but often fails under sustained load.
In London, ventilation design must account for local borough compliance expectations, mixed-use sensitivity and long-term maintenance exposure. Performance over time is the standard by which systems are judged.
Extraction should therefore be specified with measurable engineering basis, documented assumptions and realistic lifecycle planning.
Fan Services Ltd has delivered commercial kitchen ventilation across London since 2015. Our focus remains on technically sound planning, design and compliant installation built for sustained day to day operations.
If you have any questions about technical design assessment and compliant installation planning in London, consult Fan Services Ltd.


FAN SERVICES LTD
You will have learned by now, what our speciality is. We are a long established London business. We take care of everything for you so you don't have to worry. Fan Services Ltd has the expertise and experience you're looking for.
Free Estimates - Call 0203 539 1475.
HVAC ventilation upgrades, design, install, repairs and maintenance.
London, City of London, City of Westminster & Greater London
We provide services for all of Inner London: Westminster, Kensington and Chelsea, Hammersmith and Fulham, Wandsworth, Lambeth, Southwark, Tower Hamlets, Hackney, Islington and Camden.
...and Outer London: Brent, Ealing, Hounslow, Richmond Upon Thames. Kingston upon Thames, Merton, Sutton, Croydon, Bromley, Lewisham, Greenwich, Bexley, Havering. Lewisham, Barking and Dagenham, Redbridge, Newham, Waltham Forest, Haringey, Enfield, Barnet, Harrow and Hillingdon.
Fan Services Ltd Head Office
Suite 44, 2-3 Coleridge Gardens, London NW6 3QH, UK. Telephone 0203 539 1475




